Fees for Approval and Renewal under the Boilers Act, 1923

  1. Fees for Registration and Renewal of Boiler

❶ Boiler Registration Fee

❷ Renewal of Boiler Certificate.

☛ Above 3000 sq. meters, for every 200 sq. meters or part thereof an additional fee of Rs. 500 shall be charged:

☛Inspection fee for separately fired Super-heater, Re-heater and Feed water heater shall be charged at the same rate.

☛For Heat Recovery Steam Generators with finned tubes, the fee shall be calculated on heating surface area of bare tubes and on one fourth of heating surface area of fins.

☛For renewal of certificate for a period of six months or less on the request of owner, half of applicable fee shall be payable.

☛Applicable fee shall be payable again for the re-inspection of a defective boiler after completion of repairs.

☛For inspection on Sundays and Public Holidays under the Negotiable Instrument Act, 1881 (26 of 1881), on the request of owner, additional fee equivalent to half of applicable fee shall be payable.

  1. Fee for Transfer of Boiler Record to another State

◉ fee of Rs. 1000 per boiler shall be charged by the transferor State from the boiler owner.

  1. Fees for Approval/Renewal of Boiler Erector/repairer
Sr.No. Class of boiler repairer Fee for recognition in rupees Fee for renewal of recognition in rupees Fee for endorsement in rupees

(1)

(2)

(3)

(4)

(5)

1.

Special Class

15,000/-

7,500/-

5,000/-

2.

Class I

10,000/-

5,000/-

4,000/-

3.

Class II

5,000/-

2,500/-

2,000/-

4.

Class III

2,500/-

1,250/-

1,000/-

  1. Fees for the scrutiny of the Boiler Manufacturing Drawings

◉ The fees for the scrutiny of the manufacturing drawings and the particulars of the materials design and construction of boilers and boiler components including spares shall be

☛ Above 3000 sq. meters, for every 200 sq. meters or part thereof an additional fee of Rs. 500 shall be charged:

☛ but when the manufacturing drawings have been scrutinised and in respect of them alterations have been suggested and the same are resubmitted for scrutiny, separate fee at the rate of ten per cent of the fee for the first scrutiny of the drawings shall be payable if the manufacturing drawings contain alterations other than those previously suggested.

  1. Fees for Steam Pipe line Drawing Approval

◉ The fees for examination of plans and the particulars of materials, design and construction of steam pipes before the commencement of manufacture of the steam pipes shall be at the rate of Rs. 200 for 30 metres of piping or part thereof subject to a minimum of Rs. 5,000.

  1. Fees for Inspection of Steam Pipe line.—

(a) For the pipes of nominal bore not exceeding 100 mm inclusive of all fittings excepting fittings like de-superheaters, steam-receivers, feed heaters and separately fired superheaters Rs. 500 for 30 metres of pipe or part thereof.

(b) For pipes of nominal bore exceeding 100 mm inclusive of all fittings excepting

fittings like de- superheaters, steam receivers, feed heaters and separately fired

superheaters Rs. 1200 for 30 metres or part thereof .

  1. Fees for any fitting, mountings and components (without heat transfer)

◉ The fees for examination of plans and the particulars of materials, design and construction of any fitting, mountings and components (without heat transfer) like valves, dished ends, hand hole covers, man hole covers, flanges, etc., shall be Rs. 300 for each category of such identical fittings, but for fittings like de-superheaters, steam receivers, separators, fee shall be Rs. 1,000 for each category of such identical fittings.

  1. Inspection fee for boilers and part thereof constructed in India (Manufacturing of Boilers at Maker’s site)

◉ The inspection fee for boilers shall be calculated at four times the fee shown below

Above 3000 sq. meters, for every 200 sq. meters or part thereof an additional fee of Rs. 500 shall be charged:

  1. Inspection fee for tubes and pipes constructed in India (Manufacturing at Maker’s site)

◉ For inspection of tubes and pipes, the fee shall be charged at the rate of Rs. 360 per metric tonne or a part thereof.

  1. Inspection fee of Boiler (Erection at site)

◉ Fees for inspection of boiler at the site of construction (Erection at site) shall be charged at the rate of four times the fee shown below

Above 3000 sq. meters, for every 200 sq. meters or part thereof an additional fee of Rs. 500 shall be charged:

  1. Inspection fee for forged pipe fittings constructed in India (Manufacturing at Maker’s site)

◉ For inspection of forged pipe fittings, the fees shall be charged as shown below

Sr. No. Size Fees in rupees
1 upto and including 25 mm for a batch of 50 or part thereof Rs. 300
2 upto and including 25 mm for a batch of 100 or part thereof Rs. 520
3 over 25 mm upto and including 50 mm for a batch of 50 or part thereof Rs. 580
4 over 50 mm upto and including 100 mm for a batch of 25 or part thereof Rs. 580
5 over 100 mm upto and including 250 mm for a batch of 10 or part thereof Rs. 620
6 over 250 mm for a batch of 5 or part thereof Rs. 720

  1. Inspection fee for pipe fittings other than forged pipe fittings constructed in India (Manufacturing at Maker’s site)

◉ For inspection of pipe fittings other than forged pipe fittings, the fees shall be charged as shown below

Sr. No. Size Fees in rupees
1 upto and including 25 mm for a batch of 50 or part thereof Rs. 600
2 upto and including 25 mm for a batch of 100 or part thereof Rs. 1040
3 over 25 mm upto and including 50 mm for a batch of 50 or part thereof Rs. 1600
4 over 50 mm upto and including 100 mm for a batch of 25 or part thereof Rs. 1160
5 over 100 mm upto and including 250 mm for a batch of 10 or part thereof Rs. 1240
6 over 250 mm for a batch of 5 or part thereof Rs. 1440

  1. Inspection fee for pipe and tube bends constructed in India (Manufacturing at Maker’s site)

◉ For inspection of pipe and tube bends, the fee shall be charged at the rate of Rs. 10 per meter subject to a minimum of Rs 300.

  1. Inspection fee for valves and flanges.

  1. Fees for inspection of valves

Subject to a minimum inspection fee of Rs. 600 per inspection, the fees for

inspection of valves shall be charged as under

Sr. No. Size Fees in rupees
1 Up to 25 mm Rs. 20 per piece
2 Above 25 mm and upto 100 mm Rs. 60 per piece
3 Above 100 mm and upto 250 mm Rs. 400 per piece
4 Above 250 mm Rs. 1000 per piece

  1. Fees for inspection of flanges

  1. for forged and cast flanges

Sr. No. Size Fees in rupees
1 upto and including 25 mm for a batch of 50 or part thereof Rs. 300
2 upto and including 25 mm for a batch of 100 or part thereof Rs. 520
3 over 25 mm upto and including 50 mm for a batch of 50 or part thereof Rs. 580
4 over 50 mm upto and including 100 mm for a batch of 25 or part thereof Rs. 580
5 over 100 mm upto and including 250 mm for a batch of 10 or part thereof Rs. 620
6 over 250 mm for a batch of 5 or part thereof Rs. 720
  1. for plate flanges, the fees shall be charged as shown below

Sr. No. Size Fees in rupees
1 Up to 25 mm Rs. 20 per piece
2 upto and including 25 mm for a batch of 50 or part thereof Rs. 150
3 upto and including 25 mm for a batch of 100 or part thereof Rs. 260
4 over 25 mm upto and including 50 mm for a batch of 50 or part thereof Rs. 290
5 over 50 mm upto and including 100 mm for a batch of 25 or part thereof Rs. 290
6 over 100 mm upto and including 250 mm for a batch of 10 or part thereof Rs. 310
7 over 250 mm for a batch of 5 or part thereof Rs. 360
  1. Fees for Approval of Feed water Pipe line Drawing and Inspection
  1. Fees for the scrutiny of plans of feed pipes.

(1) The fees for the scrutiny of plans and particulars of the material, design and construction of feed pipes, before commencement of manufacture of the feed pipes shall be at the rate of Rs. 200 for 30 metres of piping or part thereof.

  1. The fees for the scrutiny of plans and particulars of the material, design and construction of any such fittings like feed water heater shall be charged at Rs. 2500 per fitting
  1. Fee for Inspection feed water heaters and other fittings.
  1. Fees for inspection of feed water heaters shall be charged at Rs. 10,000 per heater.
  2. Fees for inspection of other fittings like de-superheaters, steam receivers and separately fired superheaters shall be charged at Rs. 2500 per fitting.

  1. Fee for Inspection of Feed Water Pipe line.—

(a) For the pipes of nominal bore not exceeding 100 mm inclusive of all fittings excepting fittings like de-superheaters, steam-receivers, feed heaters and separately fired superheaters Rs. 500 for 30 metres of pipe or part thereof. (b) For pipes of nominal bore exceeding 100 mm inclusive of all fittings excepting fittings like de-superheaters, steam receivers, feed heaters and separately fired superheaters Rs. 1200 for 30 metres or part thereof.

  1. Inspection fee for spares, all types of coils and boiler components.

The inspection fee for all types of coils, namely, economiser coils, superheater coils, reheater coils, the fee shall be charged at four times the fee shown below

Above 3000 sq. meters, for every 200 sq. meters or part thereof an additional fee of Rs. 500 shall be charged:

  1. Economiser Registration fee.

An application for registration of economiser shall be accompanied by fee as shown below

Above 3000 sq. meters, for every 200 sq. meters or part thereof, an additional fee of Rs. 600 shall be charged

  1. Fee for Renewal of Certificate of Economiser

An application for renewal of certificate of economiser shall be accompanied by fee as shown below

Above 3000 sq. meters, for every 200 sq. meters or part thereof an additional fee of Rs. 500 shall be charged:

  1. Fee for certification of welders

Fees for Examination of welders and issue of certificate.

(1) Fees for examination of welders under these regulations shall be Rs. 600 which shall be borne by the applicant or sponsor, as the case may be.

  1. The fee for endorsement of welder’s certificate shall be Rs. 200 and shall be borne by the applicant or sponsor, as the case may be.

Issue of duplicate welder certificate

Fee for issue of duplicate certificate shall be Rs.300/-

  1. Fee for Approval and Renewal of Boiler Manufacturer

No Fees